PORTSMOUTH — Just a walk away from where Church Community Housing (CCH) is building a new senior housing complex on Bristol Ferry Road, the nonprofit has proposed a new low- to …
This item is available in full to subscribers.
Please log in to continue |
Register to post eventsIf you'd like to post an event to our calendar, you can create a free account by clicking here. Note that free accounts do not have access to our subscriber-only content. |
Are you a day pass subscriber who needs to log in? Click here to continue.
PORTSMOUTH — Just a walk away from where Church Community Housing (CCH) is building a new senior housing complex on Bristol Ferry Road, the nonprofit has proposed a new low- to moderate-income housing development with about 40 residential units.
Two separate concept plans, presented to the town’s Technical Review Committee Tuesday afternoon, call for the units to be built on two lots located on the east side of Bristol Ferry Road and Turnpike Avenue, on either side of Sprague Street. Both lots are zoned residential, R-20.
The existing building on the north lot (13 Bristol Ferry Road) formerly housed a restaurant and then a child care center/school, while the vacant south lot (corner of Sprague Street and Turnpike Avenue) was once used for a gas station.According to plans drawn up for CCH by LDEC Engineering & Consulting, LLC, 15 residential units with at least 25 percent designated as low- to moderate-income housing would be built on the 31,385-square-foot north lot in two separate three-story buildings.
Three of those units would be housed in a building fronting Bristol Ferry Road, with the remaining 12 units in a larger building behind it. A rear parking lot with 17 spaces would be accessible via Sprague Street.
On the larger south lot (1.45 acres), 25 similar units would be housed in a three-story building with a footprint of just over 10,000 square feet. A total of 46 parking spaces are planned on the south and east sides of the building, with access from both Turnpike Avenue and Sprague Street.
CCH will be seeking several variances from the zoning ordinance for its plan. Most are for the north lot, which would contain more than one principal building in an R-20 zone.
Other variances concern requirements on setbacks and parking; minimum front, side and rear yards for low- and moderate-incoming housing; minimum building land area for properties with onsite sewer systems; and more. The south lot also needs a variance because it has one more housing unit than allowed for a single building.
Planners to review Aug. 14
The Technical Review Committee, which consists of members of the fire, police, building, planning, water and public works departments, will provide feedback on the proposal, which goes before the Planning Board on Thursday, Aug. 14.