Letter: Troubled bridge over Silver Waters

Posted 5/2/19

Before doing any work on the bridge project over Silver Creek, it is important to understand the flooding problems along the lower creek and the measures needed to solve them, rather than taking a …

This item is available in full to subscribers.

Please log in to continue

Log in

Register to post events


If you'd like to post an event to our calendar, you can create a free account by clicking here.

Note that free accounts do not have access to our subscriber-only content.

Day pass subscribers

Are you a day pass subscriber who needs to log in? Click here to continue.


Letter: Troubled bridge over Silver Waters

Posted

Before doing any work on the bridge project over Silver Creek, it is important to understand the flooding problems along the lower creek and the measures needed to solve them, rather than taking a piece-meal approach that wastes funding as well as imposing undue hardships to the town.

The creek floods periodically to close the bridge and creates a public safety hazard that has not been addressed. The flood-prevention work on the bridge several years ago was a failure and a waste. The bridge was even flooded and closed by only a moderate storm as the work was completed. It had been repaired at the same flood-prone elevation.

This was said to be due to a bureaucratic mandate to obtain funds. The proposed rebuilding of the bridge, as recently described, would also waste funds as well as miss an opportunity for improvement. If not, it is more waste and more construction.

Silver Creek originally had a wide opening into the harbor. The damming of the creek by the railroad and Hope Street and the fill dumped in the harbor between them and along the banks to the east has caused this situation to develop. Removal of the barrier and raising of the bridge can alleviate the problem except for major hurricanes. The short length of this bridge should be at least doubled, and the roadway raised two feet.

If Sip ’n Dip was relocated across Hope Street, its site and a temporary bridge near or on the bike path could be used as a short detour during construction. Then the harbor fill could be removed. This would greatly reduce the impact on the town’s citizens and businesses.

Raising the bridge also would reduce the impact of sea-level rise, which is measured in this area as three-quarters of a foot per 100 years, and possible increased storm impact. This would give Bristol a cushion for the change.

A bonus would be a greatly enhanced view of our beautiful harbor as visitors enter the town from the north and the scene suddenly appears.   

Patrick Barosh, PhD
Bristol

2024 by East Bay Media Group

Barrington · Bristol · East Providence · Little Compton · Portsmouth · Tiverton · Warren · Westport
Meet our staff
Jim McGaw

A lifelong Portsmouth resident, Jim graduated from Portsmouth High School in 1982 and earned a journalism degree from the University of Rhode Island in 1986. He's worked two different stints at East Bay Newspapers, for a total of 18 years with the company so far. When not running all over town bringing you the news from Portsmouth, Jim listens to lots and lots and lots of music, watches obscure silent films from the '20s and usually has three books going at once. He also loves to cook crazy New Orleans dishes for his wife of 25 years, Michelle, and their two sons, Jake and Max.